Thứ bảy, 06/06/2026
ENGLISH | 中文 | BACNINHTV
Bắc Ninh 27 °C / 28 - 37 °C
Hotline: +84.889.859.666
ENGLISH | 中文 | BACNINHTV
bacgiang-en-tourism Tourism
Chia sẻ:
icon
0.5 1.0 1.5

180-day campaign launched to accelerate Long Thanh airport project

Thứ 3: 17:19 ngày 02/06/2026

At the event, contractors and project stakeholders pledged to mobilise maximum resources and maintain round-the-clock construction operations to ensure all components are delivered on schedule.

Chia sẻ:
Chủ đề:
180-day-campaign-launched-to-accelerate-long-thanh-airport-project-postid447019.bbg

Ý kiến bạn đọc (0)

Bình luận của bạn...